Terms and Conditions
Fasteners: Manufacturer requires the use of nails, some of which may protrude through the soffit overhangs and into Owner's attic space. Contractor is not responsible for painting soffits or any
damage that the nails may cause if this occurs. Please note that Cascade Roofing is not responsible for clipping or making any adjustments to the nail length.
Attic: Contractor may install Ridge Vent as part of the Project. This work involves cutting sheathing back. When this happens, debris may fall into Owner's attic. Owner needs to make sure all
valuables are out of harm's way or covered with appropriate protection. Contractor is also not responsible for disconnected exhaust systems, including exhaust related to the bathrooms and/or
kitchen or any other venting that may be blocked. Cascade Roofing is not responsible for damages to insulation due to debris, water, and leakage.
Skylights: Cascade Roofing recommends that all skylights be replaced. Cascade Roofing will make every effort not to damage existing skylight. Cascade Roofing is not responsible for damage
to existing skylights or future leakage around flashing or skylight. There is no warranty on existing skylights.
Layers: During the inspection, Contractor will inspect the number of layers on the existing roof. If there are any layers discovered during the tear off in addition to the results of the inspection,
Owner may be subject to additional charges. Cost for additional layers to be removed is $55.00 per square, per layer.
Siding: Roof to wall step flashing and other flashing is essential to keep Owner's roof watertight. Contractor will need to get behind Owner's siding, and such siding may be brittle and break. This
may require new siding or paint; Contractor is not responsible for the paint or damaged siding. Contractor may however fix such siding issues for additional charges.
Ventilation: Some homes/buildings may have some ventilation issues that could block and or limit airflow from entering and exiting your attic space. Some of these issues are known to cause
defects in roofing materials. Contractor will make reasonable efforts to ensure ventilation is up to code, however some roofs may not allow for a full ventilation system. Contractor/Manufacturer is
not responsible for any ventilation issues that may arise.
Smart Venting: If it is determined that you need additional intake venting, Contractor will cut in new Smart Intake Venting on the roof side. This may have a small bump along the eve usually
within two feet from the gutter line. No additional charges will be added to the original price of the contract.
Completion/Payment: As a substantial amount of work has been completed, on some occasion there will be open services that cannot be performed due to product availability, crew availability,
custom work, etc. We still expect full payment as this will become an open service. Contractor will ask for a completion form, final loan documents, and ask for payment at this time.
Satellites: Contractor is not a satellite technician. To perform the work, Contractor will remove Owner's satellite dish, and Owner will lose satellite reception. Satellite dish must be professionally
reinstalled by your satellite provider. Homeowner is responsible for all fees that are incurred through satellite provider.
Outside of Home: Homeowners are aware this is an active construction site. Keep things 10ft from home. Cascade Roofing is not responsible for shrubbery, plants, or any item left within area
that can be damaged by construction. Cascade Roofing is not responsible for reattaching electrical cable lines.
Inside of Home: Homeowners are aware this is an active construction site. Home may sway or settle. Cascade Roofing is not responsible for damaged items to the interior of home due to the
nature of construction, for example decoration on walls, cracks, lighting, tile work, nail pops, etc.
Pets: Cascade Roofing cares for all pets. All dogs and other animals should be put away, for their safety during delivery of products and installation of project. Cascade Roofing is not responsible
for your animals, harm or accident, loss, homeowners assume all responsibility.
Gutters: During the roofing project it is common for gutters to be taken down and reinstalled. Cascade Roofing is not responsible for damage to gutters, gutter covers, or any water damage to
home due to lack or gutters or gutter damage.
Access: Homeowners allow Cascade Roofing access to property included but not limited to front and backyard, electrical outlets and etc.
Property Damage: Cascade Roofing uses different services for deliveries. Cascade Roofing is not responsible for those third parties damages stemming from delivery, materials, dump vehicles,
trusses etc.
Wood Replacement: If Contractor has wood-work repair anywhere in or around the home including but not limited to fascia board, siding, barge rafters, rafters, and soffits, then Contractor is not
responsible for painting, staining, and/or sealing the new wood.
Materials: All materials on-site during the Project are owned by Contractor. All materials leftover after the completion of the project belong to Contractor. It is not uncommon for Cascade Roofing
to over order materials to save on time.
Below are additional Terms and Conditions in addition to your CONTRACTOR'S AGREEMENT. Please take the time to read thoroughly and sign when you're finished.
1. Scope of Work: Contractor shall furnish the material, labor, equipment, tools, and supervision (the "Work") necessary to construct and/or renovate the roof ("Project") for Owner on the Property in accordance with
the Contractor's Agreement of this Agreement and any executed change orders. This Agreement and all of its Exhibits, and all Change Orders after execution, are the "Contract Documents." Contractor agrees to
promptly inform Owner of any discrepancies, errors, or omissions in the plans or material changed or unanticipated conditions. Contractor shall be entitled to an equitable adjustment to the Contract Price and/or
Contract Time for such changed conditions.
2. Exclusions: Owner understands and agrees that removal of the existing roof and flashing may expose some degree of water damage or rot requiring additional repairs that are not part of the above Scope of
Work. Any necessary repairs will be brought to Owner's attention and an additional written estimate and/or Change Order/Exhibit G will be provided. Generally, such repair work is estimated on a time and material
basis. Commencement and completion of the project may be impacted by weather conditions. Estimate includes all labor and materials required for installation of a new roof as described in Scope of Work.
3. Contractor Representations: Contractor shall perform all work in a workmanlike manner according to standard industry practices. Contractor will remove and dispose of any debris and waste that are made by
Contractor. To complete work in a timely manner Contractor may use subcontractors for gutters, sheetrock, roofing, painting, siding, windows, etc. Contractor requires all subcontractors to have active licenses, bond,
and insurance as required by state laws.